Stay Connected:

Owners

Owners choose Dectron’s for its value, reliability, low energy costs and years of trouble-free performance

Engineers

Engineers rely on Dectron’s trusted and proven performance backed by exceptional design support

Contractors

Contractors prefer Dectron’s ease of installation, factory startup and extended warranty protection

Dectron Dry-O-Tron

Trusted and Proven

24-7 Internet monitoring
for real peace of mind

The ultimate tool to ensure peak system performance

READ MORE   >

Discover why other world-class
facilities have chosen Dectron

“O" BY CIRQUE DU SOLEIL
Bellagio Hotel, LAs Vegas

The designers of the aquatic circus facility had to make sure that dehumidification made audience members feel like they were near the pool, not in it.

READ MORE   >

Rothwell-Brewer CompleX
University of Missouri

Custom design offers a huge HVAC operational savings to the University of Missouri Student Recreational Center Complex.

READ MORE   >

KAPPEN AQUATICS CENTER
Philadelphia, PA

Designers at the Kappen Aquatic Center in Philadelphia didn’t intend to become the first LEED® Platinum natatorium in the United States. But that’s exactly what happened – and Dectron played a role in this special achievement!

READ MORE   >

HILTON MILWAUKEE CITY CENTER
HOTEL, Wisconsin

Rigging the 30-foot-long Dry-O-Tron challenges contractor, but, specifying a one-piece unit cuts costs on the $40 million expansion. Photo by Vincent Desjardins.

READ MORE   >

GREENBRIER FAMILY YMCA
Chesapeake, Virginia

The Greenbrier Family YMCA in Chesapeake took the lead when it came time to upgrade their aging dehumidification system, by choosing the highly efficient Dectron LEEDeR.

READ MORE   >